T-Bone Construction, Inc.

Design-Build Commercial Construction Colorado Springs, CO Est. 1986 PPRBD licensed since 1996, number on request

Division 00

What we build

Five divisions of work, four sectors, and a statement of the project size this firm is the right one for — and the size it is not. That last part is more useful to you than a claim to do everything.

00Divisions

Five divisions

Numbered the way a schedule of values is numbered. The references are for this document only and are not CSI MasterFormat numbers.

The architect and the superintendent work for the same company. A detail that will not build gets caught at the drawing board by the person who would have had to install it.

You receive
Permit set, schedule of values, closeout package, as-builts, O&M manuals
10–22 months

Ground-up commercial and institutional buildings in the Pikes Peak region — aviation, retail, automotive and industrial — with the site work and utilities self-performed.

You receive
Full drawing set, schedule of values, commissioning record, closeout package
12–26 months

Fitting out a shell or an existing space against a lease date that has already been signed. The work letter usually matters more than anything in the drawings.

You receive
Permit set, landlord sign-offs, certificate of occupancy, closeout package
4–12 months

Expanding or rebuilding a facility that has to keep operating. The phasing plan is the project; the construction is the easy half.

You receive
Permit set, phasing plan, schedule of values, closeout package
6–18 months

Earthwork, grading, utilities, paving and drainage, performed by our own crews with our own equipment and our own trucking — which is why the schedule holds.

You receive
Compaction and materials test records, as-built survey, utility sign-offs
6 weeks–8 months

Typical spans run from first engagement to certificate of occupancy and assume a normal permitting path and a buildable season.

01Sectors

Four sectors

Described because the firm works in them, rather than because four fills a grid. Each has a different thing that decides whether the project finishes on time.

Sector Aviation

Hangars, operations and support buildings on and around airfields

Sector Retail

Shells, fit-outs, remodels and multi-tenant work

Sector Automotive

Dealerships, service facilities and body shops

Sector Industrial

Warehousing, light manufacturing and service facilities

In all four, what decides the schedule is upstream of construction — a lead time, a lease, a utility, a report. Those are design-stage decisions, which is where a design-build firm earns its place: we are in the room for them.

02Scale

The right size, and the wrong size

This is a firm of 10–19 people. That is a real constraint with real consequences in both directions, and saying which is which is more useful than claiming to do everything.

Project fit · stated plainly rather than implied
Project Fit Why
A commercial building of a few hundred thousand to low millions Right The size where an in-house design team removes more friction than it costs
An owner with no in-house construction department Right One contract, one party answering, and far less for you to administer
A tenant improvement against a signed lease date Right Design and permitting compress when the same firm does both
An addition to a facility that keeps trading Right The phasing plan is the project and it is a design-stage decision
A hospital, a high-rise or a large institutional campus Wrong A firm of this size would be brokering most of it, which defeats the reason to hire us
A single-trade repair or a service call Wrong A specialist will be faster and cheaper; we would be the expensive answer
Residential construction Wrong A different trade with different rules. We do commercial and institutional work
A project where the lowest number is the only criterion Wrong We will not strip a number of its contingency to win it, and somebody else will

The last row is the uncomfortable one and it is the one worth trusting. A firm that tells you it is the right size for everything is telling you about its sales process rather than about your project.

Not sure which of these you need?

Most owners are not, and the answer changes the project substantially. Describe what the building has to do and we will tell you which division it mostly is, which delivery method fits, and whether a firm this size is the right one for it.